Original technical illustration of Memora8 eight CPU tiles, two interconnected buffer banks, and a MACC64 accelerator on a dark FPGA circuit board.

Memora8 Weekly: Dual-Bank PM1, MACC64, FIFO256 and FPGA Verification

The November 8–16 Memora8 engineering report: a second 32 KiB staging bank, PM1 direct bank-to-bank copying, MACC64 and its 256-result FIFO, relocated Ethernet pages, tested FPGA and Flash deployment, plus completed Mac RTL/simulator comparison.

Nov 16, 2026 · 13 min · Akhat T. Kuangaliyev
Memora8 weekly FPGA engineering illustration showing an eight-CPU Artix-7 system, MACC8, DDR3, INT8 vision, Ethernet, and SmallFIFO.

Memora8 Weekly: MobileNetV3 INT8, MACC8 and FPGA Tests

A detailed November 1–7 engineering review of the Memora8 eight-core Artix-7 platform: adapting MobileNetV3 Small to RGB888 and signed INT8, verifying 3,072,000 first-layer values, measuring PM1/MACC8 overlap, implementing eight SmallFIFOs, isolating an Ethernet System Bus blocking path, diagnosing high-address SD writes, and validating SPI Flash boot, physical Ethernet and 125 MHz timing.

Nov 7, 2026 · 30 min · Akhat T. Kuangaliyev

Memora8 MACC8: INT8 Computation, Memory Bandwidth, and FPGA Timing — A One-Week Optimization Study

The final Memora8 MACC8 configuration uses 16 parallel signed INT8 multiplications, a 128-bit datapath, four dedicated 8 KiB SRAM pages, and a 128-bit PM1 DDR3 transfer interface. Eight partial-result modes and a 128-entry FIFO provide asynchronous execution and result collection. The complete Artix-7 XC7A200T design closes timing at 125 MHz with +0.050 ns setup slack. On-board measurements reached 0.352 GMAC/s for freshly loaded 16 KiB operand pairs and 0.628 GMAC/s when reusing one operand page, including the DDR3 transfer and CPU control cycle.

Nov 2, 2026 · 36 min · Akhat T. Kuangaliyev

Memora8: One Week of Simulator Alignment and Formal CPU Verification

During October 19–25, Memora8 advanced its independent C++ emulator and the formal verification of its SystemVerilog RTL. mr8sim gained a more faithful eight-stage pipeline, per-page SRAM port arbitration, word-streamed PageMover and a persistent sparse 8 GiB SD image. Static and dynamic Sekura JS programs passed language tests; selected RTL/C++ traces matched 22/22 and 16/16 COMMIT events. The open Assurance Memora8 repository records 859 proved obligations, 51 expected counterexamples and 51 SJP packages for scoped properties across all 32 opcodes.

Oct 25, 2026 · 11 min · Akhat T. Kuangaliyev

Memora8: Eight-Core FPGA System Fits Artix-7 200T

On October 17, 2026, the complete Memora8 digital architecture passed synthesis, placement, routing, and timing analysis on an Artix-7 XC7A200T. This report covers the eight-core processor cluster, 1 MiB SRAM, System Bus, planned peripheral logic, the LOAD/STORE pipeline redesign, and implementation results: 90.2% LUT use, 84.5% Block RAM use, and +0.030 ns WNS. The bitstream was generated, while validation of external devices on the physical BX72 board remains future work.

Oct 17, 2026 · 24 min · Akhat T. Kuangaliyev

Memora8: One Week of Building an Eight-Core FPGA Computer

From October 3 to 10, 2026, Memora8 added physical microSD, UART, and GPIO tests, integrated BLAKE3 and Ed25519 VERIFY, and optimized PageMover while retaining a routed 125 MHz eight-core Artix-7 build. This report summarizes the measured results and the next steps: a custom Ethernet controller and incremental formal verification.

Oct 10, 2026 · 7 min · Akhat T. Kuangaliyev

Memora8 FPGA Implementation: 8-Core Artix-7 Status

As of October 4, 2026, the Memora8 FPGA implementation combines eight 32-bit CPU cores, 1 MiB of banked SRAM, MMU page windows, SYSTEM BUS devices, PageMover, DDR3/MIG connectivity, and UDP debug for the BX72 Artix-7 XC7A200T. The completed routed build meets 125 MHz timing, but the reported integration tests use a simulated DDR3/MIG and bypass physical Ethernet MAC/RGMII; board-level operation and the planned cryptographic accelerators remain future work.

Oct 4, 2026 · 9 min · Akhat T. Kuangaliyev

Formal Verification of SystemVerilog in Memora8: RTL Contracts and Proof Scope

Memora8 is developing a formal verification path for real SystemVerilog modules. This article explains why simulation and formal methods complement each other, how RTL properties are checked, what the current SystemVerilog subset supports, how SJP binds results to RTL and contracts, and why verification claims are made property by property.

Sep 23, 2026 · 8 min · Akhat T. Kuangaliyev

Memora8 Memory Architecture: K4,4 Topology Closes 125 MHz Timing on Artix-7

A report on finalizing the baseline Memora8 cluster memory geometry: 8 CPUs, 16 physical shared banks, 32 logical banks, 128 pages of 8 KiB, and 1 MiB SRAM. The K4,4 topology routed on an Artix-7 XC7A200T at 125 MHz with positive timing slack and one-cycle CPU reads; full integration with the MMU and other processor blocks remains to be verified.

Sep 23, 2026 · 8 min · Akhat T. Kuangaliyev

Memora8 on Artix-7: From Simulator to a Working FPGA Processor

Memora8 has moved from the mr8sim simulator to a working networked MR8 processor on an Artix-7 XC7A200T FPGA. This report explains the hardware profile, transport protocols, memory ownership model, timing work, verification results, and next steps.

Aug 30, 2026 · 12 min · Akhat T. Kuangaliyev